Last Activity:
Tickets
About Me:
-
Civil Engineering
-
Dogman
-
Rigger
-
Records Management
-
Supervisory Roles
-
HR 12 Tonner
-
Steel
-
Dogs & Chains
-
Ratchet Straps
-
Load/Unload trucks
-
Excavator
-
Heavy Labouring 30-50kg
-
Light Outdoor Labouring
-
Leading Hand/Shift Supervisor
-
Plant Machinery
-
Steel/Long lengths
-
Dirty Work
-
Trades Assistant
-
Sydney Local Knowledge
-
Documents
-
Local Work
-
Auto (Fully Automatic - not Road Ranger)
-
Flat Top
-
Metal Trades
-
All other Trades
-
Labouring
-
Iveco
-
Counter Balance
-
Hino
-
Other Australian Locations
-
NSW Regional
-
Ute
-
Regional/Country Runs
-
Telehandler
-
All Terrain Forklift
-
Manual gear box
-
Equipment
-
Concreting
-
CAR Licence
-
MR 8 Tonner
-
LR 4/6 Tonner
Work History
-
3/2019 - 1/2020
Tricomms National, QLD
Team Lead/Field Manager: In the last 12 months I have been working for Optus, VHA and Telstra on numerous projects form blackspot, Rancap and 5G. This ranges from full greenfield construction of towers and monopoles as well as upgrades Previous to this I lead a four-man team in upgrading VHA and OPTUS sites for their EJV roll out. Duties included installing new steelwork, antennas, feeders, hybrids and all internal equipment. Once completed, I was in charge of fully testing each site and photo handover. My responsibilities included, but were not limited to: • Following structural drawings accurately • Ensuring all staff followed safe and effective work procedures • Full site testing and pim, anritsu and fibre • Working to strict specifications and deadlines • Keeping the customer up to date with progress reports throughout • Time sheets, harness inspections, electrical tagging and testing • Logging man hours to keep to a strict schedule and budget
-
9/2014 - 3/2018
Oz Synergy Solutions
Team Lead: In this position my duties were the same as mentioned above for Tricomms national working on the same contracts for Optus, VHA and Telstra.
-
4/2012 - 9/2014
KORDIA
Team Lead: In this position my duties were the same as mentioned above for OSS working on the same contracts for Optus, VHA and Telstra.
-
3/2008 - 3/2012
Telent
Field Technician / Rigger: I have worked with the Alan Campbell Group in the UK and Ireland for Orange installing microwave links. I have gained experience in SDH and PDH equipment, installing dishes from 0.3 to 1.8 metres and have a good range of experience in different working conditions, including rooftops. Vodafone Germany Contract: I have previously worked in Germany for Nokia Siemens Networks installing the new fibre optic equipment for Vodafone ; this included working on the Vodafone BEP 2 roll out which has given me a very good understanding of how their network is set out down to the IP level. Police and Fire Contract: I worked with Northampton Police Force upgrading and maintaining their microwave network including liaising with Ceragon Networks and gaining good experience of microwave radio work. Additionally, we provided Northampton Police with around the clock call-out for any faults on their network. Second Year Apprentice: I worked with local UK emergency services building new command and control centres; this included all the data cabling and equipment installation within the customer's buildings. In addition to this, I was responsible for installing Tetra radios in Fire Service vehicles; duties included programming of vehicle based and hand-held Tetra radios. I also worked with British Telecom and Easynet, installing SDH and OMS equipment and commissioning new circuits and multiplexers. First year Apprentice: I carried out surveys for British Telecom to enable network distribution equipment to be installed in exchanges safely and efficiently. My duties for Easynet included customer visits to install and configuring Cisco routers with fixed ISDN lines.