Last Activity:
Tickets
About Me:
-
Electrical Trades
-
Electrical Powerline Tradesperson
-
aerial equipment
Work History
-
1/2009 - 5/2015
Western Power
Electrical Engineer: • Design officer in distribution • I have worked with new customer funded projects and reinforcement. • Proficient with Micro station power draft V8, and Micro Station V8iXM, Spider wed, Spider view • Proficient with Poles and Wires, DQM, DM, DFIS, DFMS, Flick Plus, Emac, • LV Design. • I have worked in HV 22kv HV 33 kV line design new extension. • Experience in Poles and Wires • Ground profiling. GPS Ground profile Topcon. • Experience in LV, HV over head design • LV underground design mini pillars, universal pillars, subdivision, street lights, removal, LV, HV assets. • Experience in relocating HV, LV mains. • Experience in substation non mps and mps transformer (Pad mounted transformers 25kva to 1000kva) • Experience in LV, HV switch gear. (Ring main units) • Experience in Pole to Pillars, Pole to Pillar and Transformer. • Experiences up grading LV, HV mains. • Used Topcon survey units. • Experience in engineering out customer needs. • I am currently a Safety Representative qualified work safe. • Lease with customers and their needs. • Keeping all project within budget. • Projects range from $750 to $750,000 • Very customer focussed. I
-
7/2004 - 5/2008
Country Energy
Line worker grade 5: Work involved, completion of frontline management course and, • Construction, maintenance and repair of overhead and underground distribution assets. • Installation, connection of meters and related equipment to customer's switchboards. • Installation and maintenance of street light equipment • Switching and operating work associated with high voltage and low voltage network assets. • Inspection, testing, treating and reporting upon the state of the network installations, including lines, poles and , all related equipment. • Installation, maintenance, repair and joining of power cables, signal cables and equipment associated with underground distribution system • Participate in an after hours emergency stand-by roster system as directed. • Operation of plant and equipment associated with the above duties. • All duties and functions in accordance with the current relevant Enterprise Award and Industrial Agreements.
-
7/2007 - 7/2007
Transfield services
Coordinator: • I was a coordinator in distribution • I have worked on a new project pole inspecting • I coordinate 24 men • Role of distributing work packages, tools, safety equipment, reviewing time sheets, • Auditing work and promoting safe work environments.
-
2/1988 - 2/1988
Singleton
Linesman: Linesman
-
11/1987 - 11/1987
Queensland, Rockhampton, Blackall and Longreach
Electrical Linesman, Operation Of EWP and Bucket: NPN Constructions - Queensland, Rockhampton, Blackall and Longreach Nov. 1987 - 3 month contract Work involved; • The construction of 22KV cement poles 42km's long • Positioning poles • Stringing aluminium wire
-
10/1986 - 10/1987
Tumut River Electricity
Electrical Linesman, Operation Of EWP and Bucket: Work involved; • Earthing replacement transformers • Training in the switching gear in substation OCR • Switching new construction of power lines and reconstruction of ABS's at Tumbarumba.
-
7/1986 - 10/1987
Lightening Ridge
Electrical Linesman, Operation Of EWP and Bucket: Picton Power - Lightening Ridge July 1986 - Oct. 1987 3 month contract Work involved; • Reracks • Earthing • Pole replacements • Transformer and 22KV cement poles