Last Activity:
Tickets
About Me:
-
Grader
-
Civil Engineering
-
Road Ranger (Full Manual)
-
Tippers
-
Load/Unload trucks
-
Backhoe
-
Bobcat
-
Bulldozer
-
Excavator
-
Front End Loader
-
Roller
-
Heavy Labouring 30-50kg
-
Light Outdoor Labouring
-
Plant Machinery
-
Manual Work Required
-
Steel/Long lengths
-
Machine Operator
-
Labouring
-
Traffic Controller
-
Counter Balance
-
Telehandler
-
Padfoot
-
Skid Steer
-
Final trim
-
Posi Track
-
Synchro Gearbox
-
Auto (Fully Automatic - not Road Ranger)
-
Road Ranger (Auto)
Work History
-
4/2017 - 12/2019
Mcmahon Services Australia
Full time operator (Final Trim): - FINAL TRIM EXCAVATOR WORKS - FRONT END LOADER OPERATIONS - FINAL TRIM SKID STEER WORKS - MAJOR CIVIL SITES AROUND ADELAIDE - DEEP EXCAVATIONS - ROAD RANGER TIPPERS AND WATER CARTS - LOADING UNLOADING FLOATS - TRENCHING AND LAYING PIPE - ROAD PREPERATION AND BOXOUTS - AWAY WORK 2.1 & 41 ROSTER - EXTENSIVE MACHINE OPERSTIONS - VOC FOR PLANT OPERATIONS - LONG HOURS AND CONSISTANT WEEKEND WORKS - READING PLANS AND EXCAVATING TO SPECS - HIGH SAFETY RECORD - STORMWATER - MAKING PADS AND HARD STANDS WITHIN 5mm - DIGGING AROUND SERVICES - LIFTING OPERATIONS WITH DOGMAN. EXCAVATOR AND LOADER EXPERIENCE - EXAVATOR OPERATIONS WITH GPS KNOWLEDE
-
10/2016 - 3/2017
SAFE PATHWAYS
YOUTH WORKER: - ACTIVE NIGHT SHIFTS 11PM-7AM - DIARY UPDATES - SNAKE BITE TRAINING - EXPLORING AND FISHING
-
2/2016 - 9/2016
Gunia Plant Hire
MACHINE OPERATOR: - BULK EXCAVATION - 5T - 40T EXCAVATOR WORKS - FINAL TRIM - DEEP EXCAVATIONS - FOOTPATHS & LANDSCAPE - ROAD PREPARATION - BOXOUTS - BENCH & BATTER - DIGGING WITH GPS/TRIMBLE - DARLINGTON PROJECT - NOTHERN CONNECTOR - LOADING TRUCKS - FRONT END LOADER - TORRENS 2 TORRENS PROJECT - SKIDSTEER OPERATIONS - USED D8 DOZER MULITPLE TIMES - (50hrs) M SERIES GRADER
-
1/2015 - 2/2016
Torrens 2 torrens Project
PLANT OPERATOR: (5T - 40T) EXCAVATOR WORKS - FRONT END LOADER OPERATIONS - BULK WORKS - TRENCHING (5T - 24T EXCAVATOR) - SKIDSTEER OPERATIONS - STORM WATER DIG AND LAY (6m) - 2KM HV LINE (DEEP EXCAVATION) - LABOURING - RAIL WORKS - STOCKPILE MAINTENANCE - ROAD REDEVELOPMENT - EXTENSIVE UHF COMMUNICATION - RAIL SHUTDOWN - DAILY D&A TESTING - NIGHT SHIFT WORKS - WORKING IN TIGHT AREAS
-
7/2012 - 1/2015
Various Roles (South Australia)
Civil construction and demo: - Site cleans ups (Labouring) - Spotting and marking out for excavators - Skid steer operations - Demolition - Jackhammer, quick cut, floor saw (demolition) - Long hours – weekend work (50+ hrs wk) - Excavator works (civil, demolition) - Front end loader (CAT, VOLVO, JOHN DEER, LIEBHEER) - Forklift – unloading and loading trucks - Road preparations - Footpath and landscape set outs - Bulk works (keeping dockets and EBA forms in order) - Deep Stormwater and HV line