Chat with us, powered by LiveChat

Erin - MR Driver in WEST FOOTSCRAY, MELBOURNE | Hire MR Driver | DriverJobs

Looking for a MR Driver to hire in WEST FOOTSCRAY, MELBOURNE? Erin could be the candidate for you. View their skills and reach out directly today on DriverJobs!

Erin

Candidate # : 252112

WEST FOOTSCRAY , 3012

Last Activity:

Tickets

MR Licence, First Aid Certificate

About Me:

Skilled landscaper/trade labourer, previous history of working in hospitality. Can learn anything quickly, which makes me very versatile. Happy to do overtime and currently available for any type of shift. Have own transport and willing to travel up to 50kms. Minimum $40/hour. MR license, roller tickets and first aid. Can operate up to 5T excavator and posi, however no tickets.

Skills
  • Medium Rigid (MR) Truck Driving

  • Car Driving License

  • Light Rigid Truck Operation

  • Excavator Operation

  • Customer Relationship Management

  • Contract Law

  • Building Retaining Walls

  • Earthworks Engineering

  • Echocardiography

  • Problem Solving

  • Maintenance

  • Irrigation Installation

  • Order Management

  • EPIC Systems

  • Procurement

  • Contract Management

  • Aconex

  • Terraform

  • Irrigation Management

  • Landscaping

  • Contract Management

  • Conflict Management

  • Asphalt Handling

  • Civil Engineering

  • Hospitality Skills

  • Padfoot Roller Operation

  • Food Preparation

  • Road Roller Operation

  • Sales

  • Horticulture

  • Root Cause Analysis

  • Cleaning and Housekeeping

  • Operational Maintenance

  • Sequencing

  • Materials Procurement

  • Workplace Safety Procedures

  • Operation of Plant Machinery

  • Building Trades

  • Plumbing

  • Drainage Work

  • Labouring

Work History Work History
  • 3/2024 - 9/2024

    Terraform Civil

    Civil Leading Hand/Landscape Site Supervisor: Civil leading hand and landscape supervisor. Responsible as leading hand for pit installation and drainage. Use of machinery onsite, including 3T excavator, positrack, articulated dumper, padfoot and roller. Multicourt, footpath, edge beam, spoon drain, kerb and asphalt prep. Additionally responsible for managing landscaping portion of civil contracts, including subcontractor installations and council relations.


  • 10/2020 - 3/2024

    HL Landscapes

    Leading Hand/Site Supervisor: Management of hard and soft civil landscaping and earthwork operations. Working within the Tier 1 infrastructure and commercial industry to create public spaces for the community on projects such as the Metro Tunnel, Rozelle Interchange in Sydney, Level Crossing Removal and VSBA Schools Bundle. Delivery of projects on time and under budget, while maintaining and creating relationships with clients, suppliers, and subcontractors. Supervision and delivery of complex play areas including, subcontractor management, labour hire management, plant and machine management, material ordering. Set out and prep for softfall play areas, play equipment, footpaths, footings, slabs, furniture, shelters. Turf and plant stock management. Successful completion of Metro Tunnel, East and West Portals. Positive relationships were established with both the principal contractor and architecture client to overcome supply and design challenges resulting in favourable variations to the original contract. HL asked facilitate a National Tree Day with Sunbury Primary School kids as a result of successful relations with Metro Tunnel Client. Aircraft Station LXRA favourable variations to contract due to size adjustment of storm basin design missed by client during tender period. Communication with client about design changes to establish innovative and appropriate solutions for project and budget. Use of Aconex, Hammertech and 3DS Safety Systems. Training and mentorship of younger staff/labourers as well as fellow female employees.


  • 7/2020 - 10/2020

    The Nature Group

    Leading Hand/Labourer: Responsible for undertaking landscape works in Gisborne and Sunbury areas for domestic landscaper. General duties day to day as well as overseeing 1-2 labourers. Installation of driveways, retaining walls, mudstone steppers, and logs for native gardens Demolition of clients' existing backyards Training of labourers in regard to tasks undertaken Turf prep and irrigation installation


  • 1/2019 - 3/2020

    Australian Ecosystems

    Labourer: General labouring duties for both construction and softscape team. Jute mat installation, planting of stock including aquatic planting and weed maintenance. Formwork installation and pouring of retaining walls, footings, edge kerb, etc Construction and restoration of timber sleeper steps from existing land sales office. Installation of steel edging and corten steel Hydroseeding prep and application Irrigation install for nursery in South East General day-to-day site duties and maintenance EXPERIENCE 2015 - 2019