Chat with us, powered by LiveChat

Todd - HR Driver in SPOTSWOOD, MELBOURNE | Hire HR Driver | DriverJobs

Looking for a HR Driver to hire in SPOTSWOOD, MELBOURNE? Todd could be the candidate for you. View their skills and reach out directly today on DriverJobs!

Todd

Candidate # : 174084

SPOTSWOOD , 3015

Last Activity:

Tickets

HR Licence, RB - basic rigging (includes dogging)

About Me:

I am a carpenter by trade with 13 years in the industry. Most recently civil construction, bridge and civil infrastructure work, tunnel and metro stations. Also a large range of tickets and and experience in plant.

Skills
  • Civil Engineering

  • Building Trades

  • Carpenter

  • Formwork Carpenter

  • Building

  • Concreting

Work History Work History
  • 9/2019 - 2/2020

    Civil Infrastructure Group

    Formwork Carpenter: Details: Bridge construction of level crossing removal & freeway overpass. Conventional formwork, precast installation, steel modules, concrete placement & finish.


  • 9/2018 - 9/2019

    CPB Contractors

    Formwork Carpenter: Details: Bridge construction of the Westconnex New M5 St Peter's interchange. Formwork on, abutment's, outrigger's, pile cap's, column's & capital's. Other role's including, steel fixing, concrete placement & finish, operating plant, assisting with post tensioning, bridge segment placement & stressing.


  • 5/2017 - 8/2018

    Kenny Constructions

    Formwork Carpenter: Details: Construction of the Westconnex M4 motorway underground tunnels & Sydney Metro NRT Project. Large scale formed up wall's, beams & deck's (Peri, RMD, Uni-span & conventional), precast installation (50T plus), concrete placement & finish, drainage & pit's installation, conduit's, dogging tower crane and plant operation.


  • 9/2016 - 4/2017

    Formwork on pit's, substation & transformer slab's

    Formwork Carpenter/Concreter: Details: Aubin Grove train station construction & civil works for the Airport Link. Formwork on pit's, substation & transformer slab's, large light tower footing's, pouring & finishing concrete, grouting, steel fixing, rigging, earthwork's & trenching.


  • 6/2016 - 8/2016

    Civmec Construction & Engineering

    Formwork Carpenter FIFO: Details: Working in the Civmec precast yard & onsite at Roy Hill mine site with job's


  • 1/2016 - 6/2016

    Horizon Constructions

    Formwork Carpenter: Details: High rise construction, forming up deck's, wall's, stair's & step down's. Using Peri, AFS & convention system's.


  • 8/2015 - 12/2015

    ATCO Structures & Logistics

    Carpenter FIFO: 4:1 Details: Construction of the Wheatstone LNG project, installation of blast proof office & crib room's, construction village camp expansion, set out & preparing site's, rigging, scaffolding, formwork and concreting.


  • 5/2015 - 8/2015

    Thiess, FMG Solomon Mine, WA

    Carpenter FIFO: 2:1 Details: Mine site carpenter performing a variety of role's including, camp maintenance, mobilisation of building's, rigging, formwork, concreting, steel fabrication, fencing, operating trucks and machinery.


  • 6/2014 - 5/2015

    Mineworks

    Carpenter: Details: Constructing transportable substation's & switch room's for the Wheatstone LNG Project.


  • 1/2013 - 6/2014

    R & D Homes

    Carpenter: Details: Building large homes & stepping into leading hand roles when required, organising materials & job's, footing's, formwork, scaffolding, framing, roofing, variety of wall & ceiling cladding's, fit out's and large concrete pours.


  • 7/2012 - 12/2012

    Zaccaria Constructions

    Carpenter FIFO: 4:1 Details: Rio Tinto Nickol West housing development on a framing crew doing slab set out, framing, roof trusses and roof batten's.


  • 3/2012 - 6/2012

    Fine Form Concrete

    Formwork Carpenter: Details: High-rise development doing all aspects of formwork and concreting.