Chat with us, powered by LiveChat

Mark

GOLD COAST MC
Work Experience: 18 Years 10 Months

About me:

Candidate Info :
Hi there

My previous experience and skills provide a solid base for many roles.
I am currently working for a civil construction company completing sub division works. For 2 years prior, I had been a HR truck driver for Smartstone Landscape Supplies.

Previously I was the concrete paver groundsman and sub foreman at the Brisbane Airport upgrade. This was a very hands on role that required me to ensure the concrete was laid to the correct height and level during the machine placed parts of the concrete taxi way system.

For 3 years I was a Foreman for Seovic New Zealand. I demonstrated that I could lead a team of 5 – 12 members. My team and I completed 10kms of barrier wall in The Waterview Tunnel, with a cost of $2.4 Billion, it was New Zealand’s first mined public road tunnel. In previous years I have worked on Civil Road construction.

I am a positive, hard working, family orientated man, looking to secure a long term permanent role in the transport industry.

Experience :
Worked As Truck driver and Labour hire at OM Civil from November 2021 to January 2022
Provac Australia – Vacuum Truck Operator

Worked As HR Delivery Driver at Smartstone Landscape Supplies from November 2019 to October 2021
Operating HR Roadranger Tipper
Bobcat
Front end loader
Sweeper
Forklift
Light trucks

Delivering bulk landscape supplies and materials
Loading and unloading landscape to customers South Brisbane and Gold Coast region
Logistical support
Picking up bulk supplies from quarries
Health and Safety Management
Environmental Management
General maintenance of truck and machinery
Quality Assurance
Reporting

Worked As Sub Foreman at Paver Groundsmen from March 2018 to November 2019
BMD/ Skyway Brisbane

Key responsibilities
• Ensure Paver runs to correct height • Project Planning
and offset • Resource Management
• Spotting machine movements • Leadership Delivery including
• Paver maintenance coaching the team in technical skills
• Preparation works and completing Daily Briefings and
• Setting formwork Weekly Toolbox Talks
• Site Housekeeping • Risk Management
• HSE Management • Subcontractor Management
• Planning paver works and VMP • Performance Management
• Hand placed concrete finishing • Health and Safety Management
works • Environmental Management
• Experience driving a rigged body • Quality Assurance
watercart • Reporting

Worked As Sub Foreman at CPB Group/ BMD from March 2018 to November 2019
BMD/ Skyway Brisbane – Airport Parallel runway
Ensure Paver runs to correct height
Project Planning and offset
Resource Management
Spotting machine movements
Leadership and coaching the team in technical skills
Paver maintenance
Preparation works and completing Daily Briefings and Weekly Toolbox Talks
Setting formwork
Site Housekeeping
Risk Management
HSE Management
Subcontractor Management
Planning paver works and VMP
Performance Management
Hand placed concrete finishing
Health and Safety Management
Environmental Management
Quality Assurance
Operating watercart
Reporting

Projects worked on include:
• New Parallel Runway (NPR)

Worked As Foreman at seovic civil engineering from July 2015 to March 2018
Key responsibilities
• Project Planning
• Resource Management
• Leadership Delivery including coaching the team in technical skills and completing Daily
Briefings and Weekly Toolbox Talks
• Risk Management
• Subcontractor Management
• Performance Management
• Experience driving a rigged body palfinger crane truck
• Health and Safety Management
• Environmental Management
• Quality Assurance and Reporting

Projects worked on include:
• Smart Motorway Ngaraunga to Aotea Quay, Wellington
• Mackays to Peka Peka Expressway
• Waterview Tunnel, Auckland
• Kirkbride Road interchange
• Lincoln to Westgate upgrade

Worked As Concrete Finisher at KNF Constructions from April 2015 to July 2015
Key Responsibilities
• Bridge deck pours
• Form work, steel fixing • Pavement hand pours

Worked As Trades Assistant at Gold Coast Bricklaying from November 2014 to March 2015
Key responsibilities
• Assisting tradesman with all aspects of Brick and Block laying
• Preparation of Brick and Block laying materials
• Assisting with Brick and Block laying deliveries and logistics
• Preparation of steel reinforcement and starter bars
• Basic scaffold erection and dismantling
• Brick and block cutting
• General Housekeeping of site

Worked As Guardrail Installer at A1 Highways from January 2014 to March 2014
Key responsibilities
• Installation of guardrail and wire rope barriers
• Maintenance of post driving machine
• Site housekeeping and environmental procedures

Worked As Concrete finisher at Castle Kerbing from August 2013 to December 2013
Key responsibilities
• Finishing of kerb and channel, barrier wall, type 28 spoon drains
• Set up of string and kerb machine
• Site housekeeping and kerb machine maintenance

Projects worked on include:
• Gold Coast Light rail
• Mains and Kessels upgrade
• T to E Project Byron Bay

Worked As operator at Slipform Paving Machine from November 2012 to August 2013
Wacon Services / Leighton Contractors

Key responsibilities
• Operating Wirtgen shoulder and V drain paving machines
• Setting up slip form paving machine, moulds and stringline heights and offsets
• Maintenance of paving machine and slip form moulds
• Finishing of concrete barriers, type 28 spoon drains
• Pouring and finishing of sub base, base pours and shoulder pours, SO, SSA
• Correct manual handling, site housekeeping, environmental procedures and all general
preparation work for concrete paving

Worked As Operator at Wacon Services / Leighton Contractors from November 2012 to August 2013
Slipform Paving Machine
Key responsibilities
• Operating Wirtgen shoulder and V drain paving machines
• Setting up slip form paving machine, moulds and stringline heights and offsets
• Maintenance of paving machine and slip form moulds
• Finishing of concrete barriers, type 28 spoon drains
• Pouring and finishing of sub base, base pours and shoulder pours, SO, SSA
• Correct manual handling, site housekeeping, environmental procedures and all general
preparation work for concrete paving

Projects worked on include:
• Sapphire to Woolgoolga Bypass

Worked As Seismic Survey Worker at Schlumberger/ Western Geco from March 2012 to March 2012
Key Responsibilities
• Set up and transportation of seismic surveying equipment
• Navigation and plotting of seismic lines
• Coordinating with other departments
• General maintenance of mobile camp and equipment

Worked As Seismic Survey Worker at Sapphire to Woolgoolga Bypass from March 2012 to March 2012
Schlumberger/ Western Geco

Key Responsibilities
• Set up and transportation of seismic surveying equipment
• Navigation and plotting of seismic lines
• Coordinating with other departments
• General maintenance of mobile camp and equipment

Worked As Concrete Finisher General Labourer at South East Concrete PTY from April 2009 to February 2011

Worked As laying Trades Assistant at Brick and Block from March 2002 to April 2009
LDS Bricklaying

Worked As laying Trades Assistant at LDS Bricklaying from March 2002 to April 2009
Brick and Block

Worked As Trades Assistant at COOMERA SHORES PLUMBING from February 2001 to March 2002

Accreditation

HC Licence,Traffic History,White/Green OH&S Card,Excavator Ticket (LE),Front End Loader (LL),Skid steer,ForkLift (LF)

Skills

  • Machine Operator
  • Administration
  • Labouring
  • Finishing
  • Solid Plasterer
  • Building Trades
  • Trades & Services
  • Concreter
  • Supervisory Roles
  • Leading Hand/Shift Supervisor
  • Concreting
  • Management
  • Sterling
  • Mitsubushi
  • Mack
  • Kenworth
  • Isuzu
  • Hino
  • Turf
  • 8 tonners Bulk Delivery
  • Multi-drop
  • Counter Balance
  • Skid Steer
  • Front End Loader
  • Bobcat
  • Plant Machinery
  • Equipment
  • Synchro Gearbox
  • split gearbox
  • Road Ranger(Full Manual)
  • Manual gear box
  • Mack Box
  • Bricklayer
  • Forklift
  • Local Work
  • Construction / Civil
  • LR 4/6 Tonner
  • MR 8 Tonner
  • HR 12 Tonner

Work History

  • OM Civil
  • Smartstone Landscape Supplies