About me:
Candidate Info :
hi
Experience :
Worked As MECHANICAL FITTER at Monadelphous from January 2018 to January 2020
Karratha Gas Plant / Pluto Gas Plant Maintenance / Shutdown
20th May-30th June
Downer
MECHANICAL
Arcadia Gas compression station
Key Responsibilities:
➢ Installation of spooling and valves
➢ Flange Management
➢ Ensure all work is completed within strict timeframes and Key Performance Indicators (KPI’s)
➢ Attend and participate at morning toolbox meetings
➢ Pre starts on all machinery and equipment prior to the commencement of shift
➢ Completion of Job Safety Analyses (JSA’s), Safe Work Method Statements (SWMS) and Take 5’s
➢ Completion of site assessments, risk assessments and hazard identification
➢ Ensure full compliance with work, health and safety regulations at all times whilst on site
25th April – 16th May
Monadelphous
MECHANICAL
Pluto Gas Plant Major Shutdown 12 Hour Nightshift
Valve crew removal and replace valves and actuators
Key Responsibilities:
➢ Installation of spooling and valves
➢ Flange Management
➢ Ensure all work is completed within strict timeframes and Key Performance Indicators (KPI’s)
➢ Attend and participate at morning toolbox meetings
➢ Pre starts on all machinery and equipment prior to the commencement of shift
➢ Completion of Job Safety Analyses (JSA’s), Safe Work Method Statements (SWMS) and Take 5’s
➢ Completion of site assessments, risk assessments and hazard identification
➢ Ensure full compliance with work, health and safety regulations at all times whilst on site
Worked As LEADING HAND / MECHANICAL FITTER / BOILERMAKER at Decmil / East Coast Development from August 2012 to March 2016
Contracted to QGC QCLNG Surat Basin / Decmil Project # 50101 – 5270 Coal Seam Natural
Gas Project – Fly In / Fly Out (FIFO) Roster – 4 Weeks On / 1 Week Off
Key Responsibilities:
➢ Responsible for overseeing the day to day operations in the new infrastructure construction
installations/ system commissioning and maintenance requirements of LNG processing plants and associated pipe lines
➢ Supervision of staff (up to 10 Tradespersons), the delegation of daily duties and ensure all work is
conformed to quality, time and productivity company requirements
➢ Attend and facilitate morning pre-start toolbox meetings
➢ The installation of gas / water separator packages including marking out pads and crane lifts into
position
➢ Completion of Quality Assurance, Inspection and Test Records paperwork
➢ The drawing up, fabrication, welding, installation and field measuring of pipe spools and torque
flanges
➢ Installation of DB valve skids and hydraulic pumping units
➢ Shutdowns on the Gas Plant including removing of valves and spooling (2 inches to 72 inches),
fabricating and reinstating within limited timeframes
➢ Installation of cable trays and cables
➢ Attend breakdown repairs to ensure continuity of operations
➢ Completion of all associated paperwork including daily reports, timesheets and scheduling
➢ Liaise with management, clients, Mechanical and other team members
➢ Completion of Job Safety Analyses (JSA’s), Safe Work Method Statements (SWMS) and Take 5’s
➢ Completion of site assessments, risk assessments and hazard identification
➢ Required to read isometric and structural plans
➢ The provision of technical support to staff and advise on any issues that they are unable to resolve
➢ Implementing and maintain a safe working environment for all employees and contractors and that
they are in compliance with all applicable health, safety and environmental laws, regulations and statutory obligations
Worked As fitter at Brisbane Ship Constructions from March 2012 to August 2012
BOAT BUILDER
Key Responsibilities:
➢ Responsible for the fabrication and engineering of a 34 metre Ferry for a leading boat builder
➢ Engine alignment and amongst other engineering systems
➢ Stainless steel fabrication
Worked As BOILERMAKER at Telum from July 2011 to March 2012
Airport Link Tunnel, Bowen Hills Site
Key Responsibilities:
➢ Responsible for the installation of jet fans, lighting and smoke dampers on the Airport Link Tunnel
➢ Attend morning toolbox meetings
➢ Pre starts on all machinery and equipment prior to the commencement of work
➢ Assisted with the installation of the Deluge System
➢ Completion of JSA’s, SWMS and Take 5’s prior to the commencement of work
➢ Site assessments, risk assessments and hazard identification
➢ Ensure full compliance with work, health and safety regulations at all times whilst on site
Worked As FABRICATION / WELDING SUPERVISOR at Ullrich Aluminium from May 2010 to July 2011
Key Responsibilities:
➢ Responsible for overseeing the day to day operations in the fabrication of aluminium products for
the marine, industrial, commercial, domestic and designer industries
➢ Supervision of staff and delegation of daily duties
➢ Provision of quotations and estimations
➢ Fabricating of products including Platform Ladders and Solar Panel Systems
➢ Designing and fabricating of Roller Gates
➢ General administration duties including answering of phones and the prompt reply to all emails,
faxes and other forms of request
➢ Working with the sales team to ensure all sales margins were met
➢ Implementing and maintain a safe working environment for all employees and that they are in compliance with all applicable health, safety and environmental laws and regulations
Worked As FABRICATOR at Reef Magic Cruises from March 2010 to May 2010
Key Responsibilities:
➢ Responsible for the fabrication, welding and designing of underwater walkways
➢ The designing, measuring and of walkways whilst under the water
➢ Attend and participate at morning toolbox meetings
➢ Pre starts on all machinery prior to the commencement of shift
➢ Completion of all associated paperwork including JSA’s, SWMS and Take 5’s
➢ Risk assessments and hazard identification prior to the commencement of work
LICENCES AND COMPETENCIES
➢ Training Certificate – has Attended a Training Course Covering Instruction in the principles and practices as detailed within the Training Units Below:-
HT19 – Bolted Joint Integrity and Hydraulic Torque Tightening
HT18 – Boiled Joint Integrity and Hydraulic Bolt Tensioning
HT10 – Bolted Joint Integrity and Hand Torque Tightening
➢ LBG – Bridge / Gantry, 3 Power Remote Control Loader Over 5T – Certificate No:
01711186
➢ Licence to Perform High Risk Work
LF – Forklift Truck
WP – Boom Type Elevating Work Platform
Licence No: 6 Expires 23rd October 2017
➢ Verification of Competency – Skid Steer Loader Operations
Skid Loader Verification Using Caterpillar Posi-Track Skid Steer Loader Model 237B3
➢ Statement of Completion – VOC for Elevating Work Platform – VOCEWP
➢ Statement of Completion – VOC for Telehandler Operations – VOCTELE
➢ RIIVEH201B – Operate Light Vehicle
➢ RIIVEH305A – Operate and Maintain a Four Wheel Drive Vehicle
➢ Certificate of Training – For the Successful Completion of Atlas-Mechanical Isolations
➢ Aluminium Portable Power Tools Operation
➢ Verification of Competency – Vehicle Mounted EWP
Vehicle Mounted Elevated Work Platform Verification of Competency using NIFTY 50 to Ford Ranger Model NL70LVM
➢ Verification of Competency – Medium Rigid Truck Operations (Manual Synchro Gearbox)
Medium Rigid Truck Verification of Competency using Mitsubishi Fuso with a Manual
Synchromesh Gearbox Towing a Pig Trailer
➢ Statement of Attainment – Secure Cargo – TLIA1001A
➢ Statement of Attainment – Apply Fatigue Management Strategies – TLIF2010A
➢ Statement of Attainment – Make a Presentation – BSBCMM401A
➢ QGC – Upstream Operations Field Induction Card
Card No: 242 820
➢ Supervision Training
➢ Occupational Health and Safety Construction Induction – Card No: 1436533
Accreditation
HR Licence,Traffic HistorySkills
- Machine Operator
- Manufacturing
- Boat Builder
- MIG
- Building Trades
- Boat Mechanic
- Fabrication
- General Mechanical Engineering Tradesperson
- Mechanical Trades
- Supervisory Roles
- Trades & Services
- Construction / Civil
Work History
- Monadelphous
- Decmil / East Coast Development


